| MOQ: | 10 komputer PC |
| harga: | Bisa dinegosiasikan |
| Kemasan Standar: | Karton |
| Periode Pengiriman: | 15 hari kerja |
| Metode Pembayaran: | L/C,T/T,Western Union |
| Kapasitas Pasokan: | 1000 pcs / minggu |
| Kapasitas (kg) | FEM | ISO | Ketinggian (m) | Kecepatan angkat (m/menit) | Kecepatan troli (m/menit) | Motor angkat (kw) | Motor Trolley (kw) |
|---|---|---|---|---|---|---|---|
| 3200 | 2m | M5 | 6/9/12 | 0-5 | 0-20 | 3.2 | 0.4 |
| 3200 | 2m | M5 | 6/9/12 | 0-8 | 0-20 | 4.5 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-5 | 0-20 | 4.9 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-8 | 0-20 | 7.5 | 0.4 |
| 10000 | 2m | M5 | 6/9/12/18 | 0-5 | 0-20 | 9 | 0.4*2 |
| 16000 | 2m | M5 | 6/9/12/18 | 0-3.5 | 0-20 | 404 | 0.8*2 |
| 20000 | 1Am | M4 | 6/9/12/18 | 0-3.5 | 0-20 | 404 | 0.8*2 |
![]()
![]()
![]()
![]()
| MOQ: | 10 komputer PC |
| harga: | Bisa dinegosiasikan |
| Kemasan Standar: | Karton |
| Periode Pengiriman: | 15 hari kerja |
| Metode Pembayaran: | L/C,T/T,Western Union |
| Kapasitas Pasokan: | 1000 pcs / minggu |
| Kapasitas (kg) | FEM | ISO | Ketinggian (m) | Kecepatan angkat (m/menit) | Kecepatan troli (m/menit) | Motor angkat (kw) | Motor Trolley (kw) |
|---|---|---|---|---|---|---|---|
| 3200 | 2m | M5 | 6/9/12 | 0-5 | 0-20 | 3.2 | 0.4 |
| 3200 | 2m | M5 | 6/9/12 | 0-8 | 0-20 | 4.5 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-5 | 0-20 | 4.9 | 0.4 |
| 5000 | 2m | M4 | 6/9/12/18 | 0-8 | 0-20 | 7.5 | 0.4 |
| 10000 | 2m | M5 | 6/9/12/18 | 0-5 | 0-20 | 9 | 0.4*2 |
| 16000 | 2m | M5 | 6/9/12/18 | 0-3.5 | 0-20 | 404 | 0.8*2 |
| 20000 | 1Am | M4 | 6/9/12/18 | 0-3.5 | 0-20 | 404 | 0.8*2 |
![]()
![]()
![]()
![]()